Working closely with our consultants and construction manager we devised a plan that repaired the crumbling concrete structure, filled in many of the vomitoriums, and moved the traffic flow from under the bleachers to in front of them. Changing crowd circulation greatly reduced the number of people needed to supervise entry points and observe for safety and security. New seatback chair sections were also installed with refurbished bleacher seating.