Total: 380,000 SF

Office Space: 11,900 SF

Interior Train Track

Overhead Doors

description

ACI Boland created a large, modern tilt-up manufacturing plant for MiTek Industries to assist in expanding production of engineered products. The interior features office space for administration, while the remaining space is dedicated to large-scale production tasks.

Efficiency, storage, and accessibility were key goals of the design. The plant houses large industrial manufacturing equipment including seven 20-ton presses and two 40-ton presses, along with two 30-ton and four 15-ton gantry cranes for material handling. Additionally there are 300 linear feet of interior train track for offloading material and all-weather work.

The building is designed for high pile storage and features a 12-inch reinforced concrete slab for material storage. To ensure accessibility throughout the site, there are eight overhead doors and three drive-in doors.

MiTek Industries Stamping Plant

Hazelwood, Missouri

highlights

Total: 380,000 SF

Office Space: 11,900 SF

Interior Train Track

Overhead Doors

description

ACI Boland created a large, modern tilt-up manufacturing plant for MiTek Industries to assist in expanding production of engineered products. The interior features office space for administration, while the remaining space is dedicated to large-scale production tasks.

Efficiency, storage, and accessibility were key goals of the design. The plant houses large industrial manufacturing equipment including seven 20-ton presses and two 40-ton presses, along with two 30-ton and four 15-ton gantry cranes for material handling. Additionally there are 300 linear feet of interior train track for offloading material and all-weather work.

The building is designed for high pile storage and features a 12-inch reinforced concrete slab for material storage. To ensure accessibility throughout the site, there are eight overhead doors and three drive-in doors.